Fortitude21
Home  /  Products  /  Spill Containment  /  Drum Spill Pallets  /  4-Drum Spill Pallet
Spill containment

4-Drum Spill Pallet

Product code F21-SP-401

F21-SP-401 is a polyethylene spill pallet for four 205-litre drums. Three builds share the part number: the standard pallet, 130 × 130 × 30 cm with a 250 L sump; a rackable version with a 280 L sump; and one with a drain plug. Every build holds more than 110% of one drum and 25% of all four.

4-Drum Spill Pallet

F21-SP-401 specification

ModelDimensionsSumpLoadWeight
F21-SP-401 · Four-drum pallet, standard130 × 130 × 30 cm250 L3,000 / 1,500 kg36 kg
F21-SP-401 · Four-drum pallet, rackable124 × 124 × 30 cm280 L3,000 / 1,200 kg37.5 kg
F21-SP-401 · Four-drum pallet, drain plug130 × 130 × 30 cm250 L3,000 kg UDL34 kg

Dimensions are length × width × height and weights are empty, both nominal. Load figures are the manufacturer’s published values; ask us for the test basis before you specify against them. The figure to check your containment rule against is the sump capacity, not the footprint.

Material: LLDPE, HDPE or rotational moulded polyethylene by model

Does the sump meet the rule?

For 4 drums of 205 litres, 110% of one drum is 225.5 L and 25% of the total is 205 L.

ModelSumpShare of one drumShare of all 4 drums
F21-SP-401 · Four-drum pallet, standard250 L122%30%
F21-SP-401 · Four-drum pallet, rackable280 L137%34%
F21-SP-401 · Four-drum pallet, drain plug250 L122%30%

In England the oil storage rules let drums stand on a drip tray that holds 25% of their total. Other containers need a bund of 110% of the largest or 25% of the total, whichever is greater. Other countries set their own figures, and the spill pallet calculator checks 16 regions. Check your region in the spill pallet calculator

Ordering

  • Minimum order: set in the quotation, by model and customisation.
  • Lead time: Approximately one month for a standard production run; samples in 7–15 days. Confirmed against your specification at quotation.
  • Price: on request, quoted with the Incoterms you ask for.

Every model in the Drum Spill Pallets range

ModelSump
F21-SP-101 · Full-drum sump pallet202 L
F21-SP-102 · Round single-drum, static42 L
F21-SP-102 · Round single-drum, on castors42 L
F21-SP-201 · Two-drum pallet, standard150 L
F21-SP-201 · Two-drum pallet, drain plug130 L
F21-SP-202 · Wide two-drum pallet160 L
F21-SP-203 · High-sump two-drum, plastic grate260 L
F21-SP-203 · High-sump two-drum, steel grate260 L
F21-SP-203 · High-sump two-drum, modular260 L
F21-SP-401 · Four-drum pallet, standard250 L
F21-SP-401 · Four-drum pallet, rackable280 L
F21-SP-401 · Four-drum pallet, drain plug250 L
F21-SP-403 · High-sump four-drum, plastic grate488 L
F21-SP-403 · High-sump four-drum, steel grate488 L

Drum Spill Pallets

Related guides: Secondary containment rules Choosing a spill pallet Drum storage requirements UK oil storage regulations

Common questions

How much does the F21-SP-401 sump hold?

F21-SP-401 · Four-drum pallet, standard: 250 L; F21-SP-401 · Four-drum pallet, rackable: 280 L; F21-SP-401 · Four-drum pallet, drain plug: 250 L. Check the sump, not the footprint, against your containment rule.

What load does the F21-SP-401 take?

F21-SP-401 · Four-drum pallet, standard: 3,000 / 1,500 kg; F21-SP-401 · Four-drum pallet, rackable: 3,000 / 1,200 kg; F21-SP-401 · Four-drum pallet, drain plug: 3,000 kg UDL. These are the manufacturer’s published figures; ask us for the test basis before you specify against them.

What is the minimum order for the F21-SP-401?

Minimum orders vary by model and customisation, so we set them in the quotation. A standard run takes about one month, and samples take 7 to 15 days. Send the quantity and the destination with your enquiry and we quote both.

Page updated

Quote for the F21-SP-401

Tell us the quantity, the destination and the Incoterms, and we come back with a price, the minimum order and the lead time.

Chat on WhatsApp